Filter candidates with five hard constraints, then score cost per completed job. Includes a reusable scorecard, a worked example from dated first-party prices, and a 14-day pilot checklist.

A data center photo of a single rack, overlaid with a scorecard UI of checkboxes, weight sliders and a filtering path, with one rack highlighted on the right.
On this page10

Key takeaways

How to choose a GPU cloud provider? Filter first, score second, and do not start with the hourly rate. Run every candidate through five hard constraints (VRAM and exact SKU, region and quota, billing unit, interruptibility, SLA and compliance); failing any one removes it from the pool. For the survivors, compare the cost per successfully completed job, not the listed $/GPU-hour.
Using first-party data collected 2026-11-05 at 00:55 UTC: the lowest H100 on-demand listing, $1.11/GPU-h, was marked unavailable at collection time and is eliminated; a $1.00/GPU-h Spot option is rentable but requires checkpointable work; the candidates that actually enter the scorecard are a $2.58 marketplace listing and a $3.29 dedicated-cloud listing. They are different products, not a price-only verdict.
Here is the scorecard. Copy it straight into a spreadsheet. Section 3 works through an 8-GPU, 100-hour bill with it, and section 5 lays out the 14-day pilot day by day.

Most selection guides hand you a list of dimensions and leave the ordering to you. This one fixes the order: hard constraints are boolean and never scored; only survivors enter the weighted scorecard. That removes stale listings, incompatible images and regions without quota before any money is spent. To shortlist candidates, open the TransAtlas live price database; to model your own bill, use the cost calculator.

1. Freeze the hard constraints first

A hard constraint has no middle ground. If the VRAM does not fit, the job does not run, however cheap the listing. Write them into a frozen specification and ask every candidate for evidence. That is far cheaper than discovering the gap on an invoice.

ConstraintFields for the specificationCost of failureHow to verify
VRAM and exact SKUGPU SKU, memory size, PCIe/SXM variant, GPU count, interconnectWeights or activations do not fit; the run failsTrial run with the longest input and largest batch
Region and quotaRegion / zone, quota ceiling, target start timeListed in the catalog but cannot be launchedReal placement test in the target zone
Billing unit and granularityPer GPU or per node, per second / minute / hour, minimum billable durationShort jobs billed for a full hourRead the official billing terms and reconcile one invoice
InterruptibilitySpot or marketplace reclaim, notice window, checkpoint intervalHours of progress lostRead the interruption terms and rehearse a recovery
SLA and complianceSLA scope, data residency, audit and identity controlsNo production guarantee or failed complianceRead the contract; reject a bare "99.9%" claim

Two details are routinely missed. Billing unit: some quotes are per whole node and others per single GPU, so mixing them makes the same card look several times more expensive. The AWS EC2 On-Demand pricing page (checked 2026-11-05) documents per-second billing with a 60-second minimum for Linux, while SUSE is still billed by the full hour. Short jobs must account for that. Software fit: the image's driver, CUDA and framework versions must match your container, and the NVIDIA CUDA Compatibility guide (checked 2026-11-05) defines minor-version and forward-compatibility boundaries across driver versions. For interruptible capacity, the Azure Spot Virtual Machines documentation (checked 2026-11-05) states explicitly that these VMs have no SLA and roughly 30 seconds of notice before eviction. For sizing memory and separating SKUs, see our RTX 5090 vs 4090 rental comparison and rental pitfalls guide.

2. Convert the sticker price into effective cost

The listed rate is only the first line of the invoice. Write a completed job as:
effective cost = billed GPU-hours × rate × (1 + recompute rate) + storage + egress + idle + retries + migration and engineering time
Only the first term appears in a comparison table; whether the rest applies depends on your workload and the provider's terms. The AWS On-Demand pricing page (checked 2026-11-05) lists data-transfer charges alongside a 100 GB/month free egress allowance, so egress is not an assumption to skip. The AWS Spot pricing page (checked 2026-11-05) documents that Spot prices adjust gradually with supply and demand and can be discounted by up to 90% versus On-Demand. The discount is real, and so is the recompute risk.

Take 8 H100s for 100 hours: 800 GPU-hours. Here is what that bill looks like. Every rate below comes from the TransAtlas live price database snapshot, collected 2026-11-05 at 00:55 UTC, normalised to USD per single GPU-hour. Availability is the status recorded at collection time, not a permanent judgement.

CandidateType / state at collectionRateNominal cost, 800 GPU-hEnters scorecard?Reason
Lium H100 NVL on-demandMarketplace / unavailable$1.11$888NoFails the real-availability constraint
Nebius H100 SpotSpot / available (EU-NORTH1)$1.00$800ConditionalOnly if the job checkpoints and retries automatically
Akash H100 on-demandMarketplace / available$2.58$2,064YesHost reliability and replacement flow still to verify
Lambda Labs H100 on-demandDedicated cloud / available (Asia Northeast)$3.29$2,632YesQuota and start time still to verify
Nebius H100 on-demandDedicated cloud / available (EU-NORTH1)$4.50$3,600YesNon-Spot reference baseline

Three conclusions. First, the lowest listing is not a budget: the $1.11 row was unavailable at collection time, so $888 is a paper number. Second, the $1.00 Spot rate must be read together with recompute: if interruptions force 20% of the work to be repeated, an assumption for sensitivity analysis rather than a measured interruption rate, so effective usage is roughly 960 GPU-hours, about $960, still below on-demand but only when automatic recovery genuinely works. A long job without checkpoints cannot use that discount. Third, the remaining $2.58 and $3.29 differ by about 28% but are not the same product: on marketplaces, suppliers set their own pricing, instance types and contracts, as the Vast.ai documentation (checked 2026-11-05) describes; dedicated clouds emphasise fixed configurations and cluster delivery. That gap belongs in the scorecard alongside support, recovery and quota, not in a price-only verdict. For the unit-cost methodology, see AI training cost comparison.

3. Classify by provider type before building the shortlist

This step classifies, it does not rank. Comparisons are meaningful within a type; across types, the service terms must be on the table too. If you want a ranked list, read Best GPU Cloud Providers 2026: TOP 10. That answers a different question.

TypeTypical evidenceBetter fitVerify separatelyRead next
Full-stack clouds (AWS / Azure / GCP / OCI)Wide regional footprint, mature identity and audit controls, co-located data servicesRegulated workloads, multi-region resilience, existing enterprise agreementsQuota and reservation semantics, region-split billingAWS vs Azure vs GCP
Dedicated GPU clouds (Lambda / Nebius / Verda and others)Fixed SKUs, clusters and interconnect, public catalog pricingMulti-GPU training, defined topology and delivery datesReal capacity in the target region, cluster start timeThree-provider comparison
Marketplaces (Vast.ai / Akash / Lium and others)Many listings, dispersed prices, supplier-defined termsInterruptible batch jobs, experiments, retryable cost-sensitive workHost reliability, replacement and data-deletion proceduresPitfalls guide

The differences are documented by the providers themselves: Lambda Docs (checked 2026-11-05) describe 16- to 512-GPU H100/B200 clusters with no long-term commitment; RunPod documentation (checked 2026-11-05) covers templates and instant clusters; Vast.ai documentation (checked 2026-11-05) explains filtering by GPU model, RAM and bandwidth while suppliers retain control of pricing and contracts. Sorting all three types by headline rate treats different service commitments as one commodity.

4. Weighted scorecard: freeze weights before collecting evidence

Only one rule, but the easiest to break: freeze the weights before the pilot starts. Otherwise the team quietly retunes them to favour the provider it already prefers. Every cell needs one piece of evidence and an evidence grade: measured (your own benchmark), contractual (SLA, quote or terms), or unverified (a catalog page or a verbal claim). A catalog specification stays in the third grade until your test or your contract proves it applies to your deployment.

DimensionSuggested weightHow to collect evidenceEvidence grade (example)
Workload fit20%Same container, same data, longest inputMeasured / benchmark log
Effective cost25%Full invoice plus cost per completed jobMeasured / dated quote
Capacity and availability20%Target-zone quota, repeated placement testsContractual / unverified
Reliability and recovery15%Interruption drill, timed checkpoint restoreMeasured / SLA terms
Software and portability10%Image, driver, export and migration trialMeasured / official docs
Commercial terms and exit10%Minimum commitment, price-change notice, data exportContractual / unverified

Do not score software fit by intuition: the NVIDIA CUDA Compatibility guide (checked 2026-11-05) defines driver and toolkit boundaries, and RunPod documentation (checked 2026-11-05) describes templates and custom images. The same applies to reliability: the Azure Spot VM documentation (checked 2026-11-05) states that Spot VMs carry no SLA and no high-availability guarantees, which should change the weight rather than be waived by a verbal assurance. Archive the completed scorecard with the raw logs so a new quote or workload can be recomputed on the same basis.

5. A 14-day pilot: test failure before signing anything

  1. Spend the first two days fixing the specification. GPU SKU, VRAM, GPU count, topology, region, image, data location and deadline, plus thresholds for throughput/latency, availability and budget.
  2. On days 3 to 5, package the workload. Version the container, dependency manifest, test dataset and repeatable command; keep secrets outside the image; write checkpoints to durable, exportable storage.
  3. On days 6 to 9, run both finalists. Repeat runs with the same container and data; record request-to-ready time, steady-state throughput, GPU utilisation, failure rate and the full invoice, not just $/GPU-hour.
  4. On days 10 and 11, rehearse failure. Interrupt a job on purpose, restore from a checkpoint, release the instance and confirm no billable volumes remain; then restore that checkpoint on a second provider and measure the real migration cost.
  5. Use the last three days to decide. Apply the frozen weights, log every exception, and retain one validated second configuration for capacity shortages or price changes.

Interruption and recovery are not theoretical: the AWS Spot pricing page (checked 2026-11-05) notes that Spot prices move with supply and demand, the AWS Spot Instance interruptions documentation (checked 2026-11-05) lists why capacity is reclaimed and the terminate/stop/hibernate behaviours, and the Azure Spot VM documentation (checked 2026-11-05) gives roughly 30 seconds of eviction notice and defines eviction policies. Marketplace replacement flows vary by supplier; see the supplier-defined instance types and contracts in the Vast.ai documentation (checked 2026-11-05). All of these should be exercised once during days 10-11.

6. Seven common mistakes

  • Treating "listed in the catalog" as "launchable". Quota, region and real capacity are three different things; run a placement test.
  • Comparing $/GPU-hour only. Whole-node quotes, minimum billable duration, storage, egress and idle time all reach the invoice.
  • Collapsing PCIe vs SXM or 40GB vs 80GB into one row. Different SKUs are not directly subtractable on price or performance.
  • Treating a Spot discount as guaranteed savings. Without automatic checkpoints and retries, recomputation eats the discount.
  • Substituting a published peak bandwidth for a measurement. Run all-reduce and the data path at your own GPU count. The MLCommons / MLPerf benchmark suites (checked 2026-11-05) show what reproducible measurement looks like, but the result still needs reproducing with your own container.
  • Picking a provider before fixing the weights. The scorecard then only rationalises the decision.
  • Never revisiting the choice. Catalogs and prices change, so the decision must be recomputable.

The measured cost and mitigation for the first four are expanded in the GPU cloud rental pitfalls guide; cost definitions are in AI training cost comparison.

7. After the decision: prices move, the framework does not

Archive the specification, the dated quote snapshot, the scorecard and the pilot logs together, and set a review cadence, quarterly or immediately when the bill structure, model size or regional strategy changes. Re-reviewing does not mean rewriting the process: re-collect prices, recompute effective cost and rerun the key benchmark on the same basis. Our October 2026 pricing report found a 0% median change for matched hyperscaler models, while Vast.ai moved +12.3% at the median with a −67% to +153% range. One framework, but different review frequencies per platform.

Start here: shortlist candidates by model and region in the live price database, model the full bill with the cost calculator, then fill in the scorecard with evidence. For side-by-side provider terms, use the provider comparison.

8. Data sources, definitions and limitations

  • Prices come from the TransAtlas live price database snapshot, collected 2026-11-05 at 00:55 UTC with 459 quotes. This article uses only valid per-GPU quotes, and lists on-demand and Spot separately.
  • In the worked example, "available / unavailable" is the status recorded at collection time, not a permanent conclusion. Reconfirm in the target region before ordering.
  • Assumptions are labelled: the 20% recompute rate is a sensitivity assumption, not a measured interruption rate. Egress, storage and engineering time are discussed without quoting unverified rates.
  • No legacy GCP on-demand figures: historical GCP on-demand figures used a different basis from official billing. The corrected comparison is in AWS vs Azure vs GCP; those legacy absolute values are not reused here.
  • External sources checked: every vendor document cited above was checked individually on 2026-11-05, and each link carries that date inline. Terms can change, so rely on the provider's then-current formal text when signing.

Data source: TransAtlas (https://compare.transatlas.co). This article contains no rankings, no paid placements and no affiliate or sponsored links.

Frequently asked questions

Q: What is the first step in choosing a GPU cloud provider?

A: Write a frozen specification of hard constraints: VRAM and exact GPU SKU, region and quota, billing unit, interruptibility, and SLA or compliance. Eliminate candidates that fail any of them before comparing prices, because an unavailable or incompatible low rate is not a usable option.

Q: Are Spot GPUs suitable for long training jobs?

A: Only when the job checkpoints automatically, retries safely and has no hard deadline. Cloud providers document that Spot capacity can be reclaimed without an availability guarantee, so include expected rework in the effective-cost formula before deciding.

Q: Why is the lowest listed hourly rate not the real budget?

A: A listing may be unavailable at collection time, quoted per whole node, or rounded up to a full hour. Storage, egress, idle time and recomputation after interruption add further cost, so the first line of a price table rarely equals the invoice.

Q: Who should set the scorecard weights, and when?

A: The team running the workload should freeze the weights with the business owner before the pilot starts and archive them. Weights must not change once scoring begins, or the scorecard only justifies a decision already made.

Q: How often should you revisit the provider decision?

A: Review quarterly, or immediately when model size, bill structure or regional strategy changes. Keeping the specification and pilot logs lets you recompute on the same basis instead of starting over.